中文Chinese
Engineering Annual Projects
  Year: 2009   Design And Construction of Liquefaction Material Tank at Taichung District of Taiwan Fertilizer Co.,Ltd 
  Year: 2010   Pile Manufacture & Driving Construction of the Project Phase II, Stage2 , 3rd District of DragonSteel  
  Year: 2009   Berths 68 & 69 to Reinforce Container Gantry Crane Rails and Enhance Infrastructure by Implated PC Pile Construction 
  Year: 2011   The Terminal Construction of The East Wharf 17 and Coast Guard Base Terminal at Taipei Harbor 
  Year: 2011   S.P.P. And Sheet Pile Driving Construction at NO.115 to NO.117 Terminal of Kaohsiung Harbor 
  Year: 2011   The First Pumping Station Construction of Lin Yuan Petrochemical Industrial, CPC 
  Year: 2009   The Second Pumping Station Construction of Lin Yuan Petrochemical Industrial, CPC 
  Year: 2009   The Construction of Storage Tank of G Area in Dalin District, CPC 
 

 壹山營造工程股份有限公司 電話:(07)226-7791代表號 傳真:(07)226-5002
 通訊處:800高雄市新興區東海街177號2樓
 電子信箱:
s177@ms8.hinet.net   / s177.isan@msa.hinet.net  版權所有‧嚴禁轉載                 長龍科技製作