中文Chinese

class_name?>

Engineering Annual Projects
  Year: 2009   The Construction of Region Roads Infrastructure of Phase-1 the Port of Kaohsiung Intercontinental Container Terminal  
  Year: 2011   The First Pumping Station Construction of Lin Yuan Petrochemical Industrial, CPC 
  Year: 2009   The Second Pumping Station Construction of Lin Yuan Petrochemical Industrial, CPC 
  Year: 2009   The Construction of Storage Tank of G Area in Dalin District, CPC 
  Year: 2012   The Construction of Storage Tank of TL-103 to TL-106 Dalin District, CPC 
 

 壹山營造工程股份有限公司 電話:(07)226-7791代表號 傳真:(07)226-5002
 通訊處:800高雄市新興區東海街177號2樓
 電子信箱:
s177@ms8.hinet.net   / s177.isan@msa.hinet.net  版權所有‧嚴禁轉載                 長龍科技製作